getfit uganda Annual report 2017
  • Download center
    • Download main report[18Mb]
  • GET FiT Website
  • Select report
    • 2013 Report
    • 2014 Report
    • 2015 Report
    • 2016 Report
  • SUMMARY
    • EXECUTIVE SUMMARY
    • A GRAPHICAL OVERVIEW
    • MESSAGE FROM ERA
    • MESSAGE FROM UK
    • ABOUT GET FiT
  • PROJECTS
    • SITI I
    • MUVUMBE
    • RWIMI
    • TORORO
    • SOROTI
    • KAKIRA
    • NKUSI
    • NYAMWAMBA
    • LUBILIA
    • WAKI
    • SITI II
    • KYAMBURA
    • SINDILA
    • NDUGUTU
    • NYAMAGASANI I + II
    • KIKIGATI
  • PORTFOLIO
    • PORTFOLIO STATUS
    • EXPECTED PORTFOLIO OUTPUT
    • RE-APPRAISAL OF PROJECTS
  • E&S
    • ENVIRONMENTAL AND SOCIAL BENCHMARK
    • GET FiT FOLLOW-UP AND SUPPORT
    • PERFORMANCE – IMPROVEMENTS AND REMAINING CHALLENGES
    • MINIMUM FLOW – AN UNRESOLVED ISSUE
  • ACHIEVEMENTS
    • GET FiT VISIBILITY
    • DEVELOPMENT OF GET FiT LESSONS LEARNED
    • CANCELLATION OF CONTRACT FOR PERFORMANCE REVIEW
    • GET FiT KNOWLEDGE TRANSFER
  • GRID
    • THE CHALLENGE
    • ADDRESSING THE CHALLENGE
    • INTERVENTIONS THROUGH GET FiT
    • WIDER SECTOR INTERVENTIONS
    • GET FiT PROJECT EXPERIENCES FROM 2017
    • CONNECTION STATUS – PROJECT UNDER CONSTRUCTION
  • LEGACY
    • THE LEGACY OF GET FiT
  • ACADEMIC
    • DECENTRALISED RENEWABLE ENERGY PRODUCTION
    • ABC OF POWER SYSTEM STABILITY
    • BENEFITS OF DISTRIBUTED POWER GENERATION
  • FINANCIAL
    • FUNDING COMMITMENTS
    • FOREIGN EXCHANGE RATE DEVELOPMENTS
    • DISBURSEMENT PROJECTIONS
  • PROGRAM
    • PROGRAM MONITORING
    • RISK MANAGEMENT
  • OUTLOOK
    • OUTLOOK FOR 2018
    • STATUS OF GET FiT ROLL-OUT TO OTHER COUNTRIES
WAKI

PROJECTS

  • SITI I
  • MUVUMBE
  • RWIMI
  • TORORO
  • SOROTI
  • KAKIRA
  • NKUSI
  • NYAMWAMBA
  • LUBILIA
  • WAKI
  • SITI II
  • KYAMBURA
  • SINDILA
  • NDUGUTU
  • NYAMAGASANI I + II
  • KIKIGATI

WAKI

Run-of-river hydropower plant with a planned installed capacity of 4.8 MW and estimated 25 GWh annual production, located in Hoima and Bulisa District, Western Uganda.  The Project secured investments of USD 18.1M, with USD 3.6M in GET FiT commitments, and commenced construction during 2015.  
 
This is only one of two projects in the portfolio with a tunnel section, through which a small portion of the headrace pipeline will pass, and the only project to attempt fabrication of the steel pipeline on site.  For this purpose, the Developer established a bespoke workshop with steel plate rolling facilities on site, as well as facilities for sand blasting and applying protective coatings.  Unlike most other GET FiT projects, the Developer has benefited from the power evacuation line to the site already being completed, allowing the site to utilise grid-supplied electricity during the construction phase.
 
Construction progress was slow during the first half of the year, particularly at the weir site, where successfully implementing the river diversion works had taken substantially longer than planned.  Slow progress and issues of non-compliance with IFC Performance Standards and Ugandan regulations resulted in an enforced construction stop by both ERA and GET FiT of several months during the year.  The Developer addressed key issues and resumed construction works during Q4 2017 and is aiming to achieve commercial operation during Q3 2018.
 
35912-waki.png
 
 
 
SITI II >